Capacitor Bank Sizing (kVAR)
Compute the kVAR required to lift power-factor from current to target — APFC sizing.
Inputs
Result
kVAR required
120 kVAR
Lift PF 0.78 → 0.98
Suggested stages
5 × 24 kVAR
APFC controller — automatic switching
S P Automation match
APFC Panel
View on /products/apfc-panel
Demand charge saving (est.)
20.4%
Approx — depends on tariff structure
Ready to build?
Talk to Sunil — your numbers in hand. He'll confirm a real quote in 24 hours.
Indicative only — final values must be verified against your single-line diagram, applicable standards (IEC 60364 / 61439 / 60947 / 60529 / 60364-5-52) and local regulations.
Other tools
Sizing
Cable Size Calculator
Estimate copper cable cross-section for a 3-phase load — IEC 60364 reference.
Energy
VFD Energy Savings & Payback
Estimate annual ₹ saved and payback months when retrofitting a VFD on a centrifugal load.
Sizing
Motor Full-Load Current
Compute FLA for a 3-phase or single-phase motor — sizing contactors, breakers, OLR.